平顶山姚孟电厂四期扩建2×600MW机组工程由河南省电力勘测设计院负责设计,其初设阶段、施工图阶段、竣工图阶段的设计文件KKS编码的编制由设计院委托南京朗坤公司执行。在朗坤公司与设计院专业人员的共同努力下,2007年3月3日顺利完成施工图阶段验收!
REAL IZATION OF EQU IPM ENT FAUL TM ANAGEM ENT SYSTEM OF HYD ROPOW ER PLANTS T ang X iaohua1, D eng Z heng p eng 2, Z hou D ep ing 1, W ang L iang y ou1 (1. W uhan E lectric Pow er V ocational and Techno logical College, W uhan 430079, Ch ina) (2. H uanglongtan H ydropow er P lan t, Sh iyan 442000, Ch ina) Abstract: The equipm ent fault m anagem ent system at the H uanglongtan H ydropow er P lan t