实用标准文案 精彩文档 目 录 第一章项目经理和主要技术、 管理人员的配备··················3 第二章施工方案和方法·····································14 第三章工期和进度计划·····································25 第四章质量保证体系与措施· ································29 第五章主要机具、 设备和劳动力的配置·······················36 第六章安全文明施工措施的合理性、 科学性····················39 第七章施工部署和现场 平面布置·····························48 附图:1.施工进度横道图⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯⋯ 51 2. 施工部署平面布置图⋯⋯⋯⋯