Sinohydro Corporation Limited Manual for Road Construction - 1 - ROAD CONSTRUCTION MANUAL A. CONSTRUCTION SURVEY PROCEDURES A.1 General. The center line of the traveled portion of the road shall be located in the center of the right-of-way, and shall be located in the field by an authorized (licensed) land surveyor. A.2 Stations. Stations shall be established along the road center line ever
外贸合同 Contract( sales confirmation) 合同编号(Contract No.): _______________ 签订日期(Date) :___________ 签订地点(Signed at) :___________ 买方:__________________________ The Buyer:________________________ 地址:__________________________ Address: _________________________ 电话(Tel):___________传真(Fax):__________ 电子邮箱(E-mail):______________________ 卖方:________________