造价通
更新时间:2026.09.19
环境工程英文文献附带带翻译 (2)

格式:pdf

大小:194KB

页数: 17页

Environmental problems caused by Istanbul subway excavation and suggestions for remediation Ibrahim Ocak Abstract: Many environmental problems caused by subway excavations have inevitably become an important point in city life. These problems can be categorized as transporting and stocking of excavated material, traf?c jams, noise, vibrations, piles of dust mud and lack of supplies. Althou

变压器英文论文

格式:pdf

大小:25KB

页数: 10页

Substation system over-voltage protection technology Second substation equipment over-voltage protection on electronic information system for the protection of core equipment for the construction of a protected both pressure and other potential system, and through all levels of over-voltage surge protectors of the current step by step into the land of China, Substation secondary safety equipm

最新知识

桥梁工程英文论文
点击加载更多>>
桥梁工程英文论文相关专题

分类检索: